790-11 hot rubberized asphalt waterproofingBakor brings to the specifier over 30 years of experience in hot rubberized asphalt. Our flagship 790-11 system is backed by ISO registration, UL Class A, CCMC approval, LARR and other listings. The system is installed by Bakor trained and qualified contractors, with available warranty coverage of all components, "from the deck up".
typical 790-11 waterproofing applications
Choose 790-11 hot rubberized membrane for a high performance waterproofing or protected membrane roofing application on both horizontal and vertical surfaces. It is ideal for podium deck or plazas, protected membrane roofs, underground parking garages, bridge decks, tunnels and planters.
steps to a successful 790-11 waterproofing system.
|
||||||||||||||||||||||||||
| Step 1 | Step 2 |
|---|---|
Primer is applied to prepared substrate. |
Hot rubberized asphalt is melted in a double Jacketed kettle. |
| Step 3 | Step 4 |
|
Cracks are reinforced prior to application of membrane. |
790-11 is applied by squeegee. |
| Step 5 | Step 6 |
|
Polyester fabric is installed between membrane applications to provide a 2-layer system. |
Flashing membrane is installed at curbs and projections. |
| Step 7 | Step 8 |
|
Protection layer is provided to shield Membrane form overburden or paving. |
Assembly is completed according to requirement for roofing, plaza decks, tunnels, green roofing and other surfaces |